
1, Managent
In August 2003, the company passed ISO9001: 2000 International Quality System and in 2004, established a complete ERP system.
General Manager, Mr. Mei, is also the Managing Director of the holding company, has been assigned with the job ever since the company is established. He has more than 20 years of experience in corporate management post with areas covering international trade, engineering consultancy, project management, corporate finance, product development, sales and marketing, etc. Every year, he has to leave 1 -2 times, and attend some of the major furniture exhibition, study abroad market trends and bring back some new ideas.
Export Manager, Mr. Bond Zhang, is assigned with the post. He has 6 years of experience in overseas sales. He was graduated from local college in and has undertaken professional sales and marketing training courses in local institute. He is fully responsible for the overseas sales management of the company. Export Sales, representative, except managers, we have three sales in our company as customer service, they work hard for each detail!
Development Manager, Mr. Hong, joined the company in 2005.One of his job is to provide technical support to the production department. Meanwhile, he is also responsible for the coordination with our research and manufacturing
Production and Quality Assurance Manager, Mr. Talen, is assigned with the post since the company was certified to comply with the international quality assurance standard. Before joining the company, he has been working as the production manager of various composite panel manufacturers ever since 2002. He was assigned as the production team leader when he joined the company in 2002 and August 2003 passed the ISO9001: 2000 international quality system certification 2, Quality Control QA/QC Introduction
Export Assistant Manager, Mr. Tommy, is assigned with the post since the company was established. Being a veteran in the Company, He is very familiar with the company’s products, and production processes
Our quality-controlling department comprises 12 people composed of engineers and technicians,. With enough experience and qualification, our QC system covers all stages of production from the material and component stage to the finished product stage. In addition, we also conduct random checks and inspections on products before packing.
QC Staff :
Procedures/Testing Details:
1) Purchase raw material and other materials from reliable supplier
2) Strict inspection: no inferior products allowed
3) Strict control of work flow
4) Finished products go through strict quality inspection before dispatch
5) 6 to 11 highly skilled staff

